- Proof of Identity: Aadhaar, PAN, Voter ID, etc.
- Proof of Ownership: Registry, Rent Agreement, Property Tax
- Address Proof
- Passport-size photographs
- NOC if applicable
🧾 Online Application Process for Power Connection
- Register/Login on the Jhatpat Portal
- Fill out the online form with load and address details
- Upload required documents
- Submit the application
- Pay processing charges if prompted
- DISCOM engineer visits for site inspection
- Demand Note is generated
- Make payment online
- Meter is installed and connection is activated
💸 Estimated Charges for Power Connection in Uttar Pradesh
Load (kW) | Estimated Cost (₹) |
---|---|
Up to 1 kW | ₹1,500–2,000 |
1–5 kW | ₹2,000–5,000 |
5–10 kW | ₹5,000–10,000 |
Includes meter cost, service line fee, and security deposit.
⏱️ Time Required for Power Connection in Uttar Pradesh
- Site Inspection: 3–7 days
- Demand Note: 5–10 days
- Installation: 7–15 days
- Total Time: 15–30 days
📞 UPPCL Customer Support
- UPPCL Helpline: 1912
- Website: https://www.upenergy.in
- Email: customercare@uppcl.org
📝 Final Tips for Your Power Connection Application
- Keep digital copies of your documents ready.
- Apply using the correct load category.
- Track your application via the portal using the reference number.
📥 Download Power Connection Affidavit
⏳ Click to Start Download – Wait for 30 Seconds
For detailed information on how to pay your UPPCL bill payment online, check out our comprehensive guide.